Coal tar contaminated soils from Steel
Street gasworks
|
Developed and implemented a chemical
fixation and solidification treatment technology
|
The project resulted in NSW DECC issuing an
Immobilisation Approval and the material being successfully treated and
disposed of in accordance with the approval
|
|
Mine arsenic trioxide waste
|
Developed and implemented a chemical
fixation and solidification treatment technology
|
The project resulted in WA DEC issuing an
Immobilisation Approval and the material being successfully treated and
disposed of in accordance with the approval
|
|
Persistent organic pollutant (PCB, OCP)
destruction facility
|
Performed a compliance review for trade
waste and storm water management
|
The project resulted in the introduction of
new technologies to mitigate a breach in the site trade waste permit and
environmental license
|
|
Coke oven gas residues (PAH, B(a)P, CN, Hg,
TPH)
|
Developed and implemented a chemical
fixation and solidification treatment technology
|
The project resulted in NSW DECC issuing an
Immobilisation Approval and the material being successfully treated and
disposed of in accordance with the approval
|
|
Tin plating residues
|
Performed a review of the international
waste export requirements
|
The project resulted in the client
arranging for the export of the waste for reuse
|
|
Steel manufacturing swarf
|
Performed a review of the international
waste export requirements
|
The project resulted in the federal
environmental regulator granting a Basel export exemption
|
|
Steel manufacturing residues
|
Performed a review of the international
waste export requirements
|
The project resulted in the federal
environmental regulator granting a Basel export exemption
|
|
Coal tar contaminated soils (PAH's,
CN and phenols)
|
Developed and implemented a chemical
fixation and solidification treatment technology
|
The project resulted in NSW DECC issuing an
Immobilisation Approval and the material being successfully treated and
disposed of in accordance with the approval
|
Char Waste
(PAHs including B(a)P,
and TPH)
|
Developed and implemented a chemical
fixation and solidification treatment technology
|
The project resulted in NSW DECC issuing an
Immobilisation Approval and the material being successfully treated and
disposed of in accordance with the approval
|
|
AFU waste (TPH, PAHs and BTEX)
|
Developed and implemented a chemical
fixation and solidification treatment technology
|
The project resulted in NSW DECC issuing an
Immobilisation Approval and the material being successfully treated and
disposed of in accordance with the approval
|
|
Classification and disposal of laboratory
chemicals in accordance with the introduction of EPA Victoria Publication 996
|
Prepared a hazard classification
methodology
|
Methodology was approved by EPA Victoria
|
|
Diamond mine waste (tetrabromoethane, tribromoethane)
|
Developed and implemented a chemical
fixation and solidification treatment technology
|
The project resulted in NSW DECC issuing an
Immobilisation Approval and the material being successfully treated and
disposed of in accordance with the approval
|
|
Arsenic and lead
contaminated soil and tailings from a former silver mine
|
Performed a chemical fixation and
solidification project for the treatment of of arsenic and lead contaminated
soil
|
The project resulted in NSW DECC issuing an
Immobilisation Approval and the material being successfully treated and
disposed of in accordance with the approval
|
Pesticide contaminated soil,
chlorpyrifos, triclopyr, picloram, fluoxypyr, 2,4-D, xylenes, trichloroethanes
|
Developed a chemical fixation and
solidification treatment technology
|
The project resulted in NSW DECC issuing an
Immobilisation Approval and the material being successfully treated and
disposed of in accordance with the approval
|
|
Total Waste Management Software
|
Managed the development and implementation
of the TWM® waste and resource tracking software
|
This system is now used by a number of
Australia’s largest organisations to track waste management from a
regulatory, commercial and environmental perspective. The system was selected
by the Australian government for exhibition at the recent World Expo held in
Japan
|
|
Coal tar contaminated waste from Abbotsford
gas works (B(a)P, PAHs)
|
Developed and implemented a chemical
fixation and solidification treatment technology
|
The project resulted in NSW DECC issuing an
Immobilisation Approval and the material being successfully treated and
disposed of in accordance with the approval
|
|
Arsenic waste
|
Developed and implemented a chemical
fixation and solidification treatment technology
|
The project resulted in SA EPA issuing an
Immobilisation Approval and the material being successfully treated and
disposed of in accordance with the approval
|
|
Introduction of the new hazard classification
system for PIW - Publication 996
|
Developed a waste assessment and
classification protocol for the classification of prescribed industrial waste
(PIW)
|
Publication 996 establishes a new waste
classification system for hazardous wastes (i.e. PIW) for the state of
Victoria.
|
|
Protocols for contaminated absorbents and
rags
|
Developed a waste classification protocol
for contaminated absorbents and rags in accordance with Publication 996
|
Resulted in EPA Victoria preparing a hazard
classification for absorbents and rags
|
|
Protocol for contaminated packaging (e.g.
drums, bags etc)
|
Developed a waste classification protocol
for contaminated packaging (eg drums, bags etc) in accordance with
Publication 996
|
Resulted in EPA Victoria preparing a hazard
classification for contaminated packaging wastes
|
|
Publication 996
|
Performed a waste category streaming
project for the introduction of the new hazard classification criteria for
PIWs
|
The project resulted in EPA Victoria
establishing a set of criteria to assess the potential for treating combined
streams of PIW
|
|
Schedule 4 PIW Waste treatment facilities
in Victoria
|
Prepared a contaminant mass balance for the
Schedule 4 PIW Waste treatment facilities in Victoria
|
The project tracked the movement of
assessable contaminants from the waste generators through the schedule 4 PIW
treatment facilities
|
|
Publication 996.
|
Developed and presented a chemical
immobilisation assessment training program for EPA staff to assist with the
assessment of Immobilisation Approval application
|
Assisted EPA Victoria staff adopting best
practice methodologies in assessing contaminant immobilisation applications
|
|
Foundry sands management
|
Performed a review of foundry sands
management in Victoria, including review of existing generators, practices and
recommendations for future management
|
Provided EPA Victoria with suggestions on
how best to manage foundry sands
|
|
Uranium mine
|
Performed a major hazardous chemical
contamination cleanup
|
This project involved the segregation of
wastes and thermal destruction of hydrocarbon impacted materials.
|
|
Cockle Creek lead zinc smelter
|
Performed a review of the treatment options
for 60,000 tonnes of heavy metal impacted materials
|
The project resulted in the establishment
of suitable treatment technologies
|
|
Copper chrome arsenate (CCA) waste (As,
Cr6+)
|
Developed and implemented a chemical
fixation and solidification treatment technology
|
The project resulted in NSW DECC issuing an
Immobilisation Approval and the material being successfully treated and
disposed of in accordance with the approval
|
|
Rare earth contaminated residues from a
mineral processing operation in Malaysia
|
Developed a chemical fixation and
solidification treatment technology
|
The application will allow the company to
reuse the treated residue for a geotechnical stablilisation application
|
|
Mercury contaminated brine Waste
|
Developed a chemical fixation and
solidification treatment technology
|
The project resulted in NSW DECC issuing an
Immobilisation Approval
|
|
Mercury contaminated soil
|
Developed and implemented a chemical
fixation and solidification technology for the proposed treatment of mercury
contaminated soil
|
Commercial scale treatment was undertaken.
|
|
Fluoride impacted aluminium wastes
|
Prepared a NSW DEC Immobilisation Approval
application
|
This resulted in NSW DEC approving an
Immobilisation Approval and waste being disposed of in NSW
|
|
Landfill acceptance
|
Performed a technical and market review on
wastes to be accepted at a high security landfill
|
The project resulted in the development of
options to expand the catchment of Industrial Wastes
|
|
Electric arc furnace dust (Pb, Cd)
|
Developed a chemical fixation and
solidification treatment technology
|
The project resulted in NSW DECC issuing an
Immobilisation Approval
|
|
2000 tonnes of coal tar contaminated soil
from the former Katoomba gas works
|
Developed and implemented a chemical
fixation and solidification treatment technology
|
The project resulted in NSW DECC issuing an
Immobilisation Approval and the material being successfully treated and
disposed of in accordance with the approval
|
|
Class 4 Dangerous Goods
|
Assessed the gas generating potential and
Class 4 Dangerous Goods classification for a byproduct for an aluminium
smelter
|
The project resulted in a new material
safety data sheet being prepared that declassified the dangerous goods nature
of the material
|
|
Fluoride impacted materials from an
aluminium smelter
|
Performed a treatment project
|
The project resulted in NSW DECC issuing an
Immobilisation Approval and the material being successfully treated and disposed
of in accordance with the approval
|
|
Aluminium by-product product liability
review
|
Prepared an assessment of product liability
associated by by-product reuse
|
The project resulted in the client
assessing its commercial risk management strategies to limit liability.
|
|
Lead contaminated soil
|
Developed a chemical fixation and
solidification treatment technology
|
The project resulted in NSW DECC issuing an
Immobilisation Approval
|
|
Liquid Waste Treatment facility
|
Prepared an EPA Immobilisation Approval
application for a client for their waste treatment facility
|
This resulted in DECC issuing a draft
Immobilisation Approval for the treatment of the residues generated from the
treatment facility
|
|
Polyethylene reinforced magnesium oxide
floor boards
|
Performed an occupational health and safety
review including a review of the regulatory requirements for the cutting of
polyethylene reinforced magnesium oxide floor boards
|
This resulted in the client developing a
specification to import polyethylene reinforced magnesium oxide floor boards
|
|
Coal tar impacted soils
|
Developed and implemented a chemical
fixation and solidification treatment technology for the treatment of coal
tar impacted soils
|
The project resulted in NSW DECC issuing an
Immobilisation Approval and the material being successfully treated and
disposed of in accordance with the approval
|
|
200 tonnes of nickel contaminated filter
cake
|
Developed and implemented a chemical
fixation and solidification treatment technology
|
The project resulted in NSW DECC issuing an
Immobilisation Approval and the material being successfully treated and
disposed of in accordance with the approval
|
|
Polyaromatic impacted pitch residues from
the aluminium industry
|
Developed and implemented a chemical
fixation and solidification treatment technology for the treatment of 200
tonnes of polyaromatic impacted pitch residues from the aluminium industry
|
The project resulted in NSW DECC issuing an
Immobilisation Approval and the material being successfully treated and
disposed of in accordance with the approval
|
|
Arsenic
contaminated soil in Victoria
|
Developed a treatment technology for the
treatment of 2000 tonnes of arsenic contaminated soil in Victoria
|
Outcome pending
|